Property, as a subgroup of Stewardship team, oversees the building, contents, and grounds. Examples of this subgroup’s duties include:
- Supervising proper maintenance and protection of church property and grounds
- Providing volunteers to open and close church building
Team Leaders: Jim Garner and Steve Nivens
2026 Report
Many projects were addressed during 2025. Following is a list of projects completed:
- 2/10/26 Removed next to last pew in Sanctuary center section by cutting the 20’ pew in two pieces. Moved the last pew with the hand bell shelves up to this location. Mark Satterwhite had carpet removed and hardwood flooring installed for new electronic piano. Jim Garner took cut pew and made another leg for on section. Finished cut ends and brought both sections back to church and installed in Fellowship Hall.
- 2/10/26 Dan Hanfland purchased and set up Yamaha CPL 885 B Clavinova electronic piano in Sanctuary
- 2/22/26 Installed 12 outlet 4ft. power strip in AHU-6 mechanical room for elect.gear
- 2/22/26 Installed 12 outlet 4ft. power strip in room behind Sacristy room for sound system electronic gear
- 2/24/26 Installed two (2) Spectrum Wi-Fi Extenders in Sanctuary (on organ) and electronic closet off Cameron Hallway
- 3/10/26 Installed two (2) four step folding ladders w/grab bars in Bell Choir Room behind door and Kitchen Mop Sink Room
- 4/1/26 Francis Fingerling power washed sidewalks and parking lot curbing
- 4/14/26 Fox Hound Power Cleaning completed power washing parking lot curbing, front side walk, and around entire building
- 4/16/26 Purchased new door closer from Trudoor (Sargent 351-OU) for $495.36 and installed on right side door of Narthex Office doors
- 4/24/26 Refinished (stripped chicken wire, power washed, scrapped, sanded, 10/15/26
- , painted, reinstalled chicken wire) Easter Cross that was burned on church front lawn and stored in AHU-1 mechanical room
- 4/28/26 Replaced Narthex water cooler from Hughes Supply for $879.53
- 8/26/26 Repainted front Narthex double doors by scrapping, sanding, washing, masking, priming and painted red with 3 coats
- 8/27/26 Steve Nivens purchased 10 new white plastic top tables to replace old heavy ones
- 10/15/26 Jim Garner changed PTAC HVAC Unit #9 in Pastor’s Office out with PTAC Unit #20 in Classroom #5 Music Room due to unit freezing up because of low refrigerant charge. Changed model and serial numbers on HVAC Inventory List
- 11/4/26 Krantz Kooling & Heating replaced AHU-13B (one of the two units supplying the west side of the Fellowship Hall) due to compressor bad and refrigerant was obsolete. This was the inside evaporator and gas heating unit as well as the condensing unit in the west condenser farm. Price was $12,719.55
Submitted by James Garner 2026 Team Leader